Critical Point

Case 26 · The Bare Frame

Play free now

This page shows how the earlier cases unfolded · Back to the case files

When and where: April 2026 · CEO’s office, KD Capital 20th floor → under the tower crane at the Pyeongtaek site → Bridge Bank creditors’ meeting room → credit committee, 19th floor

The case

Three days into his new job as CEO of KD Capital, Yoon Sanghyuk slides the top file across the desk. It is the real-estate project financing, or PF, for Reheim Godeok, a 22-story officetel in Godeok, Pyeongtaek: money lent before a building goes up, on the strength of sales still to come. KD Capital stands at the front of the line with 62 billion won, and the loan matures on April 27. Construction has been stopped for three months, and since last week a man has been sitting at the top of the tower crane.

The instruction is brief. Extend it a year. You write the Risk Management opinion, because the person who knows the risk should be the one to write it down. Down on the 12th floor, Department Head Chae Ian takes the pencil from behind one ear and lays it flat. Your name is already printed in the author field. On this floor, you are told, that counts as consideration. The CEO’s field reads ‘Not applicable.’

At the Pyeongtaek site, the building is a bare concrete frame that stops at the 15th floor. Forty meters up, in the crane cab, formwork foreman Ji Kanghyun is on day nine of his sit-in. The cloth tied to the mast reads ‘Three months’ wages, 1.4 billion won, 87 workers.’ The contractor, Seum Construction, never paid its six subcontractors, so the workers went unpaid too. His voice comes down through your phone’s speaker, asking why a building they put up with their own hands isn’t theirs.

On the fence, the developer has posted a warning: unauthorized occupation will face civil and criminal action. Maturity is a little over two weeks away, and the opinion you write will choose between an extension, writing off the loss, or paying wages first.

This chapter's rule: Extension and Signature

A decision that moves the date of a loss always leaves only the name in the bottom field, and the people on the very last line take the moved date.

Who is in the room

The question this case asks

If your name goes on the paper that moves a loss one year down the road, who ends up paying on the day it finally arrives?

Play the game

This page covers only a case's first two scenes. The outcomes of your choices and the story's turns are for you to find in the game. All people, companies, institutions and events in the game are fictional.

← Previous case: Case 25 · The One Who Didn’t Come All case files Next case: Case 27 · The Neighborhood Vault →